Malden Local Notifications PLUS

القضايا المفتوحة: 80 اصدارا: 201 قضايا المعترف: 7
  • 426 Bryant St Malden MA 02148, United States - Malden Ward 7
    Any idea when the work on Bryant and Ferry Streets is going to be completed? This sign laying in the middle of the sidewalk for days on Bryant Street is a safety issue!
  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • Salem St & Broadway Malden, MA, 02148, USA - Malden Ward 8
    There was a right turn only lane coming down rt. 99 to turn onto Salem Street. It is not indicated by paint markings as it was. Will this be permanent or will right lane paint markings be added.
  • 26 Rockingham Avenue Malden, MA, 02148, USA - Malden Ward 6
    I waited for at least two weeks wanting to see if the contractor who was replacing the lead pipes in the streets to the homeowner area might do a better job at filling in the sidewalk. It has not been done. There is a big dip (not completely filled in) where they opened up the sidewalk. Can this be more leveled to meet the sidewalk. Afraid someone will lose balance while walking up and down this side of street.
  • 99–149 Forest St Malden 02148, United States - Malden Ward 5
    Flooding whenever there’s snow melt or rain. Is there a grading problem that needs to be fixed here?
  • 67 Bryant St Malden MA 02148, United States - Malden Ward 5
    The completion of these sidewalk sections has been incomplete for months. What is the hold up?
  • 54 Beltran Street Malden, MA, 02148, USA - Malden Ward 3
    The street crossing at the intersection of Jackson and Exchange has not been reconfigured to accommodate the handicapped. The recent work has not restored beveled sidewalk pathways for pedestrians crossing Exchange St. near the Jackson Street Garage.
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 4
    New crossing installed with detectable warning panels. There is a a 2 inch step from the sidewalk to the street making it inaccessible to mobility devices and defeating the purpose of a updated crossing.
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 1
    No lane lines. Took almost a month to pave a tiny strip of road that should have been a single day project. Now who knows when lane lines will be added.
  • Willow St Malden, MA, 02148, USA - Malden Ward 7
    Hoping the Willow/Cross/Bryant Street intersection is going to be painted SOON! We need this DESPERATELY! Without a solid line down the middle, stop lines at the lights and crosswalks it is an extremely dangerous area! Thanks.
  • 941 Main St Malden, MA, 02148, USA - Malden Ward 5
    Concerned about the newly traced lines on main street preparing itself for street painting. The traced lines indicate that there will be a bike lane on both sides? This eliminates parking on the even side and several cuts off parking on the odd side. Parking that is absolutely needed on Main Street. Please confirm.
  • Potholeمفتوح
    66-98 Cliff St Malden, MA, 02148, USA - Malden Ward 6
    Is the contractor or city going to pave the road now? Contractor seems to have left town