Malden Local Notifications PLUS

Offene Fälle: 215 Geschlossene Fälle: 412 Anerkannte Fälle: 53
  • 915 Main St Malden 02148, United States - Malden Ward 5
    Please have asphalt replaced with concrete panel
  • Thacher St & West St Malden, MA, 02148, USA - Malden Ward 2
    new cracks in one sidewalk panel
  • Pleasant St & Summer St Malden, MA, 02148, USA - Malden Ward 2
    Curb repair work has made sidewalk inaccessible for people with mobility devices. No detour for people using a walker, wheelchair, etc. is available. No sloped ramps connecting sidewalk to street are available. People using these devices cannot safely navigate this intersection while work is being done, and would have to completely reroute up the hill and down another street.
  • 127 Wyoming Avenue Malden, MA, 02148, USA - Malden Ward 3
    When the sidewalk and the handicap ramp were replaced on the corner of Wyoming Ave and Dutton St. the mortar in the wall of 129 Wyoming Ave. was cracked and some of it crumbled from the wall. Would it be possible for the city of repair this small section?
  • OtherÖffnen
    29–45 Garden St Malden MA 02148, United States - Malden Ward 6
    Crosswalk spray painted going across Garden Street at Columbia St needs to be painted
  • 187–199 Madison St Malden MA 02148, United States - Malden Ward 1
    Intersection of Medford St and Madison St is only 3 seconds long. Causing severe backups.
  • 901 Main St Malden 02148, United States - Malden Ward 5
    Please have the asphalt replaced with cement.
  • PotholeÖffnen
    193-251 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3
    The street and sidewalks were opened up in April 2023 to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. With the freeze/thaw of winter, the street crumbling and forming potholes. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. There has been a lot of media coverage of the state approving $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
  • OtherÖffnen
    Taylor St Malden, Massachusetts, 02148 - Malden Ward 7
    street was paved a few years ago and they left a lip of 4 inches from taylor st to cooper ct and it is ruining the lone residents vehicle (RL)
  • PotholeÖffnen
    21 Hillside Avenue Malden, Massachusetts, 02148 - Malden Ward 1
    This is a general request for the city of malden to repave all of Hillside Ave and Hillside Ter. This summer, At least 4 months of heavy duty construction work to replace a water main has left the steep hill a very uneven and hazardous zone. No final paving was ever completed, just a mix of patchwork pours. Please help us make our community safer.
  • 24 Chestnut Street Malden, Massachusetts, 02148 - Malden Ward 3
    Sidewalk still has big holes - not repaired
  • Bryant St Malden, Massachusetts, 02148 - Malden Ward 5

    In addition to Medford St, we also DESPERATELY need lines painted on MANY streets around Malden including Eastern Ave (between Main & Ferry), Bryant St (from Boylston St/Harvard St to the Everett line) and Ferry St (from just past Goldman’s to Eastern Ave).

    PLEASE! The sooner the better for everyone’s safety! No one stays to their side of the yellow lines these days anyhow, but, hopefully having the lines painted will keep more people closer to where they are supposed to be! Thank you in advance!