Malden Local Notifications PLUS

Offene Fälle: 164 Geschlossene Fälle: 384 Anerkannte Fälle: 47
  • OtherÖffnen
    49 Washington St Malden MA 02148, United States - Malden Ward 4
    Another prime example of road construction going on and absolutely no notification that the street you’re currently driving on is closed and you cannot go all the way through so you must turn around and go back the way you came. I’m unsure why it is such a hassle to provide residents notification at the beginning of a street at the street is in fact closed.
  • 2-20 Blomerth St Malden, MA, 02148, USA - Malden Ward 3
    When you need our cars moved from driveways and off street for water project please provide more notice than a knock at the door in the morning!!!
  • 143-181 Columbia St Malden, MA, 02148, USA - Malden Ward 6
    It is now Nov 21 st and we still do not have a complete road paved over in this entire area , more than a few street are half done and we all have broken driveways.
    There is half finished streets and construction going on all over the place but this was supposed to be done by now and there is no one in site just equipment, signs, cone, barrels etc all over. Can you explain please???
  • 29 Corey Road Malden, MA, 02148, USA - Malden Ward 3
    Corey road was recently resurfaced with new curbing. The problem is that between 29. Corey road driveway and 51 Corey curbing or some type of berm / curbing wasn’t installed to stop the flow of water from going behind the newly installed curb causing extreme washout of my lawn. Currently I have sandbags to stop the flow. Additional pictures available if needed.. Sincerely Gregory Rogers 51 Corey Rd
  • 5–33 Exchange St Malden MA 02148, Verenigde Staten - Malden Ward 4
    Please add a no turn on red sign facing Exchange street Due to the presence of a bike box at this intersection, the city of Malden is violating the federal MUTCD by permitting turns on red at this location Inaction to resolve this issue by placing a no turn on red sign on this approach could result in the city in losing federal funding on infrastructure projects
  • 103 Granite St Malden MA 02148, United States - Malden Ward 6
    Street dug up for repaving Didn't leave access for driveway Left a 6 inch lip Supposedly by the city notice , that is taken care of nightly ,.
  • 67 Regent Road Malden, Massachusetts - Malden Ward 1
    A couple of weeks back they replaced water pipes on the street to sidewalk. When laying the cement they left a huge gap between the driveway and the sidewalk and the front of the flower bed. It’s a hazard. When winter comes it’s going to be a issue for myself getting in my drive way. This is the second complaint I’ve made about this issue and nothing has been done.
  • 17 Fall Street Malden, MA, 02148, USA - Malden Ward 3
    Any update on when they will be returning for finish paving on Fall St? The edges are pretty rough right now and water was pooling after the recent rain. We had our cars parked elsewhere for the entire week 11/7-11/17 and no work was done.
  • 1-59 Lincoln St Malden, MA, 02148, USA - Malden Ward 3
    The street is borderline un-drivable as the majority of the road and side walk are very uneven with large dips, bumps and cracks. The uneven state of the road has worsened considerably due to the quick patching method over sections torn up by construction crews and cracks have deepened as heavy construction vehicles have driven over and parked numerous days on the road and sidewalks alike.
  • Eastern Ave Malden, MA, 02148, USA - Malden Ward 7
    Please explain the newly painted lines in every direction. With the solid lines, drivers cannot even pull over for emergency vehicles. Friends and family from outside Malden are asking what in the world do these lines mean? Please explain
  • 63 Robert'S Street Extension Malden, Massachusetts, 02148 - Malden Ward 8
    Hi, I previously submitted this issue. Recently there has been street repair near our area but they stopped right where the Roberts Street extension begins. I do not understand why. Our Robert Street extension is very uneven with big holes and patches of asphalt added by Nation grid when they did the gas line repairs. Could you please pave our extension street as well?
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 4
    New crossing installed with detectable warning panels. There is a a 2 inch step from the sidewalk to the street making it inaccessible to mobility devices and defeating the purpose of a updated crossing.