  • 3 Fairlawn St Malden MA 02148, United States - Malden Ward 4
    Does anyone know when Fairlawn and Autumn streets will have the sidewalk and streets replaced? We had a neighborhood meeting two years ago with Councilor O'Malley and we were told they were going to be replaced. I am sure Mr. Knox and Mr. O'Malley monitor this app. Can this please put on the priority list.
  • 81 Maplewood St Malden MA 02148, United States - Malden Ward 6
    Was wondering if the odd side of Maplewood Street will be getting new sidewalks like the even side did. Sidewalks are asphalt and are in poor condition from Gas station on corner up past the Webster Street/Maplewood intersections very difficult to walk on that side.
  • PotholeAnerkannt
    141 Cross St Malden MA 02148, United States - Malden Ward 1
    3 or 4 Trenches in the road, my car takes a beating everyday on my commute to Work. There is one in front of the school which is no good, and 2 more right as you pass through the light change.
  • 151–199 Boylston St Malden MA 02148, United States - Malden Ward 7
    Sign down
  • OtherÖffnen
    42 Autumn St Malden MA 02148, United States - Malden Ward 4
    Street is a mess. Dust is all over every house (inside and out) and car for weeks. Crews have not been back. Kids asthma and allergies are acting up. Probably the same for the elderly.
  • PotholeÖffnen
    192-248 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3
    The street and sidewalks were opened up in April to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. Once we get into winter, the street is going to turn into a pothole nightmare when the patches get damaged by plows and freeze thaw. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. Finally, the asphalt patches on the concrete sidewalks were done in a very temporary method, so I would like to know when these will be permanently repaired with replacement segments of concrete for the segments that were saw-cut through. I know the state approved $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
  • PotholeÖffnen
    62 Valley Street Malden, MA, 02148, USA - Malden Ward 6
    Who is paving and when?
  • 91 Medford St Malden, MA 02148, USA - Malden Ward 1
    Please replace the small single one-way sign at the corner of Madison and Medford St. heading to Bellrock with two(2) large signs as cars are trying to enter the one-way.
  • PotholeÖffnen
    Summer St Malden, Massachusetts, 02148 - Malden Ward 4
    Will Summer Street be completely repaved from Glenwood to Pleasant this year?
  • 106 Dexter Street Malden, Massachusetts, 02148 - Malden Ward 3
    sidewalk was never filled in after work was done resident has a blind daughter who walks this way (RL)
  • 1-19 Blomerth St Malden, MA, 02148, USA - Malden Ward 3
    The contractors working on the water lines have left several bags of debris and plastic buckets on the sidewalk for over a week now. The debris is next to the dumpster they have on the street, but blocking the sidewalk. Please have them clean the sidewalk before the kids go out trick or treating tomorrow. Thanks
  • 183 Exchange St Malden, MA 02148, USA - Malden Ward 4
    There is no "One Way" sign at the bottom of Abbott Street indicating that you can't turn right on Exchange Street. Saw two cars go the wrong way down Exchange within a couple minutes of one another this afternoon. Very dangerous.