Malden Local Notifications PLUS

Open Issues: 129 Closed Issues: 366 Acknowledged Issues: 39
  • 62 Valley Street Malden, MA, 02148, USA - Malden Ward 6
    Who is paving and when?
  • 1-19 Blomerth St Malden, MA, 02148, USA - Malden Ward 3
    The contractors working on the water lines have left several bags of debris and plastic buckets on the sidewalk for over a week now. The debris is next to the dumpster they have on the street, but blocking the sidewalk. Please have them clean the sidewalk before the kids go out trick or treating tomorrow. Thanks
  • 106 Dexter Street Malden, Massachusetts, 02148 - Malden Ward 3
    sidewalk was never filled in after work was done resident has a blind daughter who walks this way (RL)
  • Pleasant St & Summer St Malden, MA, 02148, USA - Malden Ward 2
    Curb repair work has made sidewalk inaccessible for people with mobility devices. No detour for people using a walker, wheelchair, etc. is available. No sloped ramps connecting sidewalk to street are available. People using these devices cannot safely navigate this intersection while work is being done, and would have to completely reroute up the hill and down another street.
  • 24 Chestnut Street Malden, Massachusetts, 02148 - Malden Ward 3
    Sidewalk still has big holes - not repaired
  • OtherAcknowledged
    26 Oliver St Malden MA 02148, United States - Malden Ward 8
    Lynn Street from Rte 1 to Everett is in dire need of repair
  • Thacher St & West St Malden, MA, 02148, USA - Malden Ward 2
    new cracks in one sidewalk panel
  • OtherOpen
    29–45 Garden St Malden MA 02148, United States - Malden Ward 6
    Crosswalk spray painted going across Garden Street at Columbia St needs to be painted
  • 19 Thacher Street Malden, Massachusetts, 02148 - Malden Ward 2
    The patch that was used to repair the sidewalk after the gas work was done is sinking causing a tripping hazard. Thank you.
  • Bryant St Malden, Massachusetts, 02148 - Malden Ward 5

    In addition to Medford St, we also DESPERATELY need lines painted on MANY streets around Malden including Eastern Ave (between Main & Ferry), Bryant St (from Boylston St/Harvard St to the Everett line) and Ferry St (from just past Goldman’s to Eastern Ave).

    PLEASE! The sooner the better for everyone’s safety! No one stays to their side of the yellow lines these days anyhow, but, hopefully having the lines painted will keep more people closer to where they are supposed to be! Thank you in advance!

  • 929 Main St Malden 02148, United States - Malden Ward 5
    Please have asphalt panel replaced with concrete.
  • 915 Main St Malden 02148, United States - Malden Ward 5
    Please have asphalt replaced with concrete panel