Malden Local Notifications PLUS
-
PotholeAcknowledged233-249 Canal St Malden, MA, 02148, USA - Malden Ward 1Can we get an update on the Canal Street paving project? Please don't send thins to Yem, I question his existence based on his track record of replying and we're tired of being ignored. If the street isn't going to be paved, can we just be told that instead of continuing to pretend there's a plan in place that never materializes
-
RepathingOpen71 Granville Avenue Malden, MA, 02148, USA - Malden Ward 5What is happening with the repathing project on Granville Ave. Started on the first of May it seems like it is on shutdown.
-
640 Main Street Malden, MA, 02148, USA - Malden Ward 4resident had asked when they put in the near wheelchair ramps here to have the barrier so no cars hit the building put back after they were done and it never was (RL)
-
PotholeOpen192-248 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3The street and sidewalks were opened up in April to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. Once we get into winter, the street is going to turn into a pothole nightmare when the patches get damaged by plows and freeze thaw. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. Finally, the asphalt patches on the concrete sidewalks were done in a very temporary method, so I would like to know when these will be permanently repaired with replacement segments of concrete for the segments that were saw-cut through. I know the state approved $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
-
Medford StreetAcknowledgedMain St & Medford St Malden, MA, 02148, USA - Malden Ward 1They repaved Medford Street one year ago now it's all patched and dug up go figure
-
PotholeOpen60 Rivers Lane Malden, Massachusetts, 02148 - Malden Ward 6In 2021 I requested my street to be repaved and was told it was done. Well, it had yet to be fixed and is in dire need to be taken care of. Just check the picture that is in the archives.
Please advise.
Thanks -
Maplewood St & Northern Strand Community Trl Malden, MA, 02148, USA - Malden Ward 6
How has this not been addressed yet? Who is overseeing this project for the city? Do you care about the handicap and accessibility laws? Or are we just about bikes?
Looks like it is time for another complaint to the state, just like Oak Grove Community Center. How much has that cost the city in fines?
-
OtherOpen1–33 Roberts St Malden MA 02148, United States - Malden Ward 8What is the updated timeline for when Roberts Street will be paved? Residents were expecting it to be completed last year, only for the city to stop at Salem Street and tell us it would be done this Spring once the water pipes were replaced. We're now in July and there is no updated communication from the city on when the re-pavement of Roberts Street will be completed, nor have any water lines been replaced Can we please get an update?.v
-
PotholeAcknowledgedBower St Malden, MA, 02148, USA - Malden Ward 3Happy 4th! There are 2 sections of Bower St in between the perpendicular streets Fall/Wiley that are in need of repair. The residents would greatly appreciate if these 2 sections could be addressed. Thank you for all your hard work!
-
Parking / Traffic SignsAcknowledged49-99 Blomerth St Malden, MA, 02148, USA - Malden Ward 3
"No Parking" signs were placed along the west side of upper Blomerth St. yesterday (Wed., 10/25) afternoon. The signs are dated for today, 10/26. No work has occurred today.
Why was parking prevented today? As has been mentioned several times is previous reports, many residents in this neighborhood do not have off-street parking. Requiring residents to park in a different section of the neighborhood creates a hardship for residents with young children and limited mobility.
The signs are still there, but the date has not been updated. According to the signage, residents can now park in this area again. Is the contractor planning on doing the work TOMORROW, 10/27, even though their signs are dated for TODAY, 10/26? Will cars parked on the street tomorrow be ticked or towed, even though they are not in violation of the signage?
Once again, residents are being treated with zero regard by the engineering department and its contractors. Is this EVER going to improve? WHEN ARE WE GOING TO RECEIVE BETTER COMMUNICATION ABOUT CONSTRUCTION WORK AND PARKING RESTRICTIONS?
-
Traffic Signals and Paint/MarkingsAcknowledgedClifton St & Dexter St Malden, MA, 02148, USA - Malden Ward 3I just went by this morning and saw there is spray paint to mark out the replacement crosswalk across Dexter St. but there is no spray paint down to make the crosswalk that was across Clifton Street at the bus stop. This is a very crucial crosswalk to connect the neighborhood so I assume this was an oversight and wanted to make sure it was part of the final repainting plan.
-
Tree - All OtherAcknowledgedLincoln St Malden, Massachusetts, 02148 - Malden Ward 3
Limb of tree rotted, heavy load on one joint area, on a windy day could eventually snap landing in neighboring yard.
Neighbor works on her garden outside, and is adjacent, and or right under her.
Tree would need to be either trimmed or evaluated.