Malden Local Notifications PLUS

Open Issues: 129 Closed Issues: 367 Acknowledged Issues: 38
  • 32 Seaview Avenue Malden, Massachusetts, 02148 - Malden Ward 5
    We recently had out side walk repaired ( on Baker Street) and while the side walks were getting repaired the folks damaged our side of the property on Baker Street (stone wall) and at the time we were told that they will just put it back without cementing it and after the side walk work is complete, they will cement it and put it back properly. It looks like they never cemented it back and this week it all came down again. I would appreciate if you would send someone to fix this. Please let me know if you need any further information.
  • 103 Granite St Malden MA 02148, United States - Malden Ward 6
    Street dug up for repaving Didn't leave access for driveway Left a 6 inch lip Supposedly by the city notice , that is taken care of nightly ,.
  • 302-306 Pleasant St Malden, MA, 02148, USA - Malden Ward 2
    While walking with a neighbor who is in a wheelchair last night we found that there are no curb cuts in the sidewalk on either side of the driveway to the T parking lot. Could those please be added? My neighbor would like to travel to Malden center with less doubling back and less jaywalking.
  • 90 Converse Avenue Malden, Massachusetts, 02148 - Malden Ward 1
    I was told by Councillor Crowe that Converse Avenue would be graded and repaved by end of Fall.
    I have been told this several times and hope it is not a False Hood as the Avenue could pass a way to see if your shocks will hold up.
  • Blomerth St & Lilly St Malden, Massachusetts, 02148 - Malden Ward 3

    Several houses lost water overnight because the temp water lines froze. We are concerned about our pipes bursting the next time that overnight temps drop below freezing (Friday night, according to current forecast). We would normally have the lines to our outdoor spigot turned off by now, but that is not possible because it is our current water source.

    Some of our neighbors are already on the new water line, but many are still on the surface temporary line.

    Can someone please update the residents on what is going on? It's getting too late in the season for the temp water lines.

  • Eastern Ave & Hillside Ave Malden, MA, 02148, USA - Malden Ward 1
    Before the repaving of Eastern Avenue, there was a crosswalk . The crosswalk has not been repainted, but the sidewalk ramp remains. I presume this was missed rather than abandoned.
  • Faulkner St Malden MA 02148, United States - Malden Ward 5
    Please! Add ramps to protect bikes from the sharp edges of the sidewalk to bike path! Bikes are being ruined because of careless construction
  • Malden MA, USA - Malden Ward 4

    I’m with Timothy! The only thing is …. THE PROBLEM ISN’T JUST AT THIS LOCATION! It is in several places across the city! I also ClickFixed recently about the Cross/Bryant St intersection/roadway and then noticed the exact same issue at Route 60 and Main Street! THIS IS JUST CRAZY! People don’t obey the lines and markings when they are painted! WITHOUT THEM THERE IS TOTAL CHAOS!

    Hoping the line painting is happening city-wide sooner rather than later! Leaving the roads as/is is EXTREMELY UNSAFE AND DANGEROUS for both pedestrians AND motorists! The sooner the painting takes place the safer we ALL will be!

    Thanks.

  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • 40 Claremont St Malden MA 02148, United States - Malden Ward 8
    I am again curious why road work is being done in the Linden School area and as a home owner in that area I find this out due to a detour sign in front of my driveway? Could you please notify the neighborhood before having a major detour running through it all day?
  • 59 Glen Rock Avenue Malden, Massachusetts, 02148 - Malden Ward 3
    Glenrock Ave’s road condition is deplorable. The street has experienced heavy construction vehicles from Melrose (Brazil St) last fall and all summer to the ongoing Malden gas upgrades. It feels like a small earthquake in my house each time a truck or school bus passes by plus items are falling to the floor from the vibrations. I’m not sure how to solve this problem but would appreciate it if you could think of something.
  • Clifton St & Linden Ave Malden, MA, 02148, USA - Malden Ward 4
    This stop sign on the intersection of Clifton and Linden Ave. heading towards Main Street is set back from the road and we have seen a number of people blow right past it. Seems like an accident waiting to happen and have heard this from a number of other Maldonians. If possible to move closer to the road it would be much more visible.