  • 1-59 Lincoln St Malden, MA, 02148, USA - Malden Ward 3
    The street is borderline un-drivable as the majority of the road and side walk are very uneven with large dips, bumps and cracks. The uneven state of the road has worsened considerably due to the quick patching method over sections torn up by construction crews and cracks have deepened as heavy construction vehicles have driven over and parked numerous days on the road and sidewalks alike.
  • 8 Murray Hill Road Malden, Massachusetts, 02148 - Malden Ward 3

    The retaining wall of my property at 8 Murray Hill Road has become significantly damaged during the road work and sidewalk work occurring over the past 2 months. The major cracks were not present prior to the jack hammering and construction activities and require repair.

    I've received a quote for the repairs, totaling $10,000. Photographs from before the construction began show that the wall did not have these significant cracks (see attached photograph).

  • 40 Claremont St Malden MA 02148, United States - Malden Ward 8
    I am again curious why road work is being done in the Linden School area and as a home owner in that area I find this out due to a detour sign in front of my driveway? Could you please notify the neighborhood before having a major detour running through it all day?
  • Highland Ave & Pine St Malden, MA, 02148, USA - Malden Ward 3
    Sidewalk has sunk below street at handicap accessible entrance. Tripping hazard.
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 1
    No lane lines. Took almost a month to pave a tiny strip of road that should have been a single day project. Now who knows when lane lines will be added.
  • 67 Bryant St Malden MA 02148, United States - Malden Ward 5
    The completion of these sidewalk sections has been incomplete for months. What is the hold up?
  • 104 Autumn Street Malden, MA, 02148, USA - Malden Ward 4
    Trailer is still parked here. Neighbor was told by parking department that it would be moved. However, that is not the case. There is a lawn and strip of road (at the dead end), across the street, where the trailer was the first night it was here. Can it be requested that the trailer be moved to that spot? This driveway cannot be blocked. Whether it is piles of snow, piles of dirt, vehicles, trailers, etc. requests made by the residents at the intersection of fairlawn and autumn seem to be disregarded.
  • 63 Robert'S Street Extension Malden, Massachusetts, 02148 - Malden Ward 8
    Hi, I previously submitted this issue. Recently there has been street repair near our area but they stopped right where the Roberts Street extension begins. I do not understand why. Our Robert Street extension is very uneven with big holes and patches of asphalt added by Nation grid when they did the gas line repairs. Could you please pave our extension street as well?
  • 59 Glen Rock Avenue Malden, Massachusetts, 02148 - Malden Ward 3
    Glenrock Ave’s road condition is deplorable. The street has experienced heavy construction vehicles from Melrose (Brazil St) last fall and all summer to the ongoing Malden gas upgrades. It feels like a small earthquake in my house each time a truck or school bus passes by plus items are falling to the floor from the vibrations. I’m not sure how to solve this problem but would appreciate it if you could think of something.
  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • OtherOpen
    93 Whitman Street Malden, Massachusetts, 02148 - Malden Ward 2

    Whitman street was paved probably about two months or so ago, and then they replaced sidewalks When is the contractor planning on coming back to put a final coat on the street? As it stands the road is messy, cones are everywhere, and the curbs are extremely high

    Appreciate any insight

  • 27 Oliver St Malden, MA, 02148, USA - Malden Ward 8
    Sewer backing up into house drain. The sewer line collapsed during construction on water line. Verified by drain service company with camera inspection.