Malden Local Notifications PLUS

Open Issues: 80 Temas cerrados: 201 Temas Reconocidos: 7
  • 104 Autumn Street Malden, MA, 02148, USA - Malden Ward 4
    Trailer is still parked here. Neighbor was told by parking department that it would be moved. However, that is not the case. There is a lawn and strip of road (at the dead end), across the street, where the trailer was the first night it was here. Can it be requested that the trailer be moved to that spot? This driveway cannot be blocked. Whether it is piles of snow, piles of dirt, vehicles, trailers, etc. requests made by the residents at the intersection of fairlawn and autumn seem to be disregarded.
  • 941 Main St Malden, MA, 02148, USA - Malden Ward 5
    Concerned about the newly traced lines on main street preparing itself for street painting. The traced lines indicate that there will be a bike lane on both sides? This eliminates parking on the even side and several cuts off parking on the odd side. Parking that is absolutely needed on Main Street. Please confirm.
  • Salem St & Broadway Malden, MA, 02148, USA - Malden Ward 8
    There was a right turn only lane coming down rt. 99 to turn onto Salem Street. It is not indicated by paint markings as it was. Will this be permanent or will right lane paint markings be added.
  • 99–149 Forest St Malden 02148, United States - Malden Ward 5
    Flooding whenever there’s snow melt or rain. Is there a grading problem that needs to be fixed here?
  • Malden MA, USA - Malden Ward 4

    I’m with Timothy! The only thing is …. THE PROBLEM ISN’T JUST AT THIS LOCATION! It is in several places across the city! I also ClickFixed recently about the Cross/Bryant St intersection/roadway and then noticed the exact same issue at Route 60 and Main Street! THIS IS JUST CRAZY! People don’t obey the lines and markings when they are painted! WITHOUT THEM THERE IS TOTAL CHAOS!

    Hoping the line painting is happening city-wide sooner rather than later! Leaving the roads as/is is EXTREMELY UNSAFE AND DANGEROUS for both pedestrians AND motorists! The sooner the painting takes place the safer we ALL will be!

    Thanks.

  • OtherAbierto
    298 Medford St Malden MA 02148, United States - Malden Ward 2
    When will the street be paved?
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 1
    No lane lines. Took almost a month to pave a tiny strip of road that should have been a single day project. Now who knows when lane lines will be added.
  • 26 Rockingham Avenue Malden, MA, 02148, USA - Malden Ward 6
    I waited for at least two weeks wanting to see if the contractor who was replacing the lead pipes in the streets to the homeowner area might do a better job at filling in the sidewalk. It has not been done. There is a big dip (not completely filled in) where they opened up the sidewalk. Can this be more leveled to meet the sidewalk. Afraid someone will lose balance while walking up and down this side of street.
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 4
    New crossing installed with detectable warning panels. There is a a 2 inch step from the sidewalk to the street making it inaccessible to mobility devices and defeating the purpose of a updated crossing.
  • Willow St Malden, MA, 02148, USA - Malden Ward 7
    Hoping the Willow/Cross/Bryant Street intersection is going to be painted SOON! We need this DESPERATELY! Without a solid line down the middle, stop lines at the lights and crosswalks it is an extremely dangerous area! Thanks.
  • 67 Bryant St Malden MA 02148, United States - Malden Ward 5
    The completion of these sidewalk sections has been incomplete for months. What is the hold up?
  • 76 Exchange St Malden MA 02148, United States - Malden Ward 4
    The street work
    Is long over, why are these tree pits still open? People are dumping trash in them Please take care of our taxpayer investment these trees are valuable assets