  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • 67 Bryant St Malden MA 02148, United States - Malden Ward 5
    The completion of these sidewalk sections has been incomplete for months. What is the hold up?
  • 27 Oliver St Malden, MA, 02148, USA - Malden Ward 8
    Sewer backing up into house drain. The sewer line collapsed during construction on water line. Verified by drain service company with camera inspection.
  • OtherAberta
    298 Medford St Malden MA 02148, United States - Malden Ward 2
    When will the street be paved?
  • Kenmore Rd Malden, MA, 02148, USA - Malden Ward 4
    I am a resident on Kenmore Road and would like to know why the City Engineer is unreachable and allowed to work from home today when Kenmore Road and Autumn Street have no water until 3pm or later? How is this reasonable?
  • 161 Boylston St Malden MA 02148, United States - Malden Ward 7

    When the curb were redone to fix the roots rising stuff. I think they may have forgot to install the Suffolk st sign

    Work was done about a month ago.

  • OtherAberta
    5 Wallace Cir Malden MA 02148, United States - Malden Ward 5
    Wallace St and Wallace Circle entrances needs to be resurfaced, it is unacceptable and dangerous. There is not only cracking of the asphalt but rutting on the entrance where the road surface is elevated up a good half foot from what it should be.
  • 3 Fairlawn St Malden MA 02148, United States - Malden Ward 4
    Does anyone know when Fairlawn and Autumn streets will have the sidewalk and streets replaced? We had a neighborhood meeting two years ago with Councilor O'Malley and we were told they were going to be replaced. I am sure Mr. Knox and Mr. O'Malley monitor this app. Can this please put on the priority list.
  • 302–318 Charles St Malden MA 02148, United States - Malden Ward 2
    Is this intersection on the list for getting real walk signals and better lights? It is a very busy intersection with people speeding toward the Fellsway or down highland. And there are lots of pedestrians with both Mystic Valley and Beebe nearby.
  • 106 Dexter Street Malden, Massachusetts, 02148 - Malden Ward 3
    sidewalk was never filled in after work was done resident has a blind daughter who walks this way (RL)
  • 43 Ivy Rd Malden, MA 02148, USA - Malden Ward 3
    Street was replaced but the crosswalk was not painted
  • RepathingAberta
    71 Granville Avenue Malden, MA, 02148, USA - Malden Ward 5
    What is happening with the repathing project on Granville Ave. Started on the first of May it seems like it is on shutdown.