Construction trenchesAbertaPoplar St Malden, MA, 02148, USA - Malden Ward 5Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
We are not able to keep our windows open because of the dust from the construction. -
Sidewalk or Curb RepairAberta67 Bryant St Malden MA 02148, United States - Malden Ward 5The completion of these sidewalk sections has been incomplete for months. What is the hold up?
-
Water - Sewer/Catch Basin/FloodingReconhecida27 Oliver St Malden, MA, 02148, USA - Malden Ward 8Sewer backing up into house drain. The sewer line collapsed during construction on water line. Verified by drain service company with camera inspection.
-
OtherAberta298 Medford St Malden MA 02148, United States - Malden Ward 2When will the street be paved?
-
Kenmore Rd Malden, MA, 02148, USA - Malden Ward 4I am a resident on Kenmore Road and would like to know why the City Engineer is unreachable and allowed to work from home today when Kenmore Road and Autumn Street have no water until 3pm or later? How is this reasonable?
-
Parking / Traffic SignsReconhecida161 Boylston St Malden MA 02148, United States - Malden Ward 7
When the curb were redone to fix the roots rising stuff. I think they may have forgot to install the Suffolk st sign
Work was done about a month ago.
-
OtherAberta5 Wallace Cir Malden MA 02148, United States - Malden Ward 5Wallace St and Wallace Circle entrances needs to be resurfaced, it is unacceptable and dangerous. There is not only cracking of the asphalt but rutting on the entrance where the road surface is elevated up a good half foot from what it should be.
-
Sidewalk or Curb RepairAberta3 Fairlawn St Malden MA 02148, United States - Malden Ward 4Does anyone know when Fairlawn and Autumn streets will have the sidewalk and streets replaced? We had a neighborhood meeting two years ago with Councilor O'Malley and we were told they were going to be replaced. I am sure Mr. Knox and Mr. O'Malley monitor this app. Can this please put on the priority list.
-
302–318 Charles St Malden MA 02148, United States - Malden Ward 2Is this intersection on the list for getting real walk signals and better lights? It is a very busy intersection with people speeding toward the Fellsway or down highland. And there are lots of pedestrians with both Mystic Valley and Beebe nearby.
-
Sidewalk or Curb RepairAberta106 Dexter Street Malden, Massachusetts, 02148 - Malden Ward 3sidewalk was never filled in after work was done resident has a blind daughter who walks this way (RL)
-
43 Ivy Rd Malden, MA 02148, USA - Malden Ward 3Street was replaced but the crosswalk was not painted
-
RepathingAberta71 Granville Avenue Malden, MA, 02148, USA - Malden Ward 5What is happening with the repathing project on Granville Ave. Started on the first of May it seems like it is on shutdown.