Malden Local Notifications PLUS

Open Issues: 129 Closed Issues: 366 Acknowledged Issues: 39
  • OtherОткрыта
    2–40 Claremont St Malden MA 02148, United States - Malden Ward 8
    I woke up today to a policeman blocking the street just outside my driveway and was told that road repairs are being done at Salem / Claremont st AGAIN, could someone please tell me why as a home owner on this street I did not get a call, letter, email or text about this construction and traffic diversion??? This is becoming completely unacceptable! It is 2022, you can easily inform a neighborhood of upcoming work in the area
  • Parking / Traffic SignsПризнана
    473–499 Cross St Malden MA 02148, Verenigde Staten - Malden Ward 7
    Please install No Turn On Red signs for both directions of Bryant Street. There are now bike two stage turn boxes in front of those approaches, therefore to comply with the MUTCD, no turn on red (R10-11) signs are required to be installed Thank you
  • 103 Granite St Malden MA 02148, United States - Malden Ward 6
    Street dug up for repaving Didn't leave access for driveway Left a 6 inch lip Supposedly by the city notice , that is taken care of nightly ,.
  • Parking / Traffic SignsПризнана
    Exchange St Malden, MA, 02148, USA - Malden Ward 4
    Exchange street parking has become a hazard
  • 90 Converse Avenue Malden, Massachusetts, 02148 - Malden Ward 1
    I was told by Councillor Crowe that Converse Avenue would be graded and repaved by end of Fall.
    I have been told this several times and hope it is not a False Hood as the Avenue could pass a way to see if your shocks will hold up.
  • OtherОткрыта
    49 Washington St Malden MA 02148, United States - Malden Ward 4
    Another prime example of road construction going on and absolutely no notification that the street you’re currently driving on is closed and you cannot go all the way through so you must turn around and go back the way you came. I’m unsure why it is such a hassle to provide residents notification at the beginning of a street at the street is in fact closed.
  • Eastern Ave Malden, MA, 02148, USA - Malden Ward 7
    Please explain the newly painted lines in every direction. With the solid lines, drivers cannot even pull over for emergency vehicles. Friends and family from outside Malden are asking what in the world do these lines mean? Please explain
  • Blomerth St & Lilly St Malden, Massachusetts, 02148 - Malden Ward 3

    Several houses lost water overnight because the temp water lines froze. We are concerned about our pipes bursting the next time that overnight temps drop below freezing (Friday night, according to current forecast). We would normally have the lines to our outdoor spigot turned off by now, but that is not possible because it is our current water source.

    Some of our neighbors are already on the new water line, but many are still on the surface temporary line.

    Can someone please update the residents on what is going on? It's getting too late in the season for the temp water lines.

  • 1-59 Lincoln St Malden, MA, 02148, USA - Malden Ward 3
    The street is borderline un-drivable as the majority of the road and side walk are very uneven with large dips, bumps and cracks. The uneven state of the road has worsened considerably due to the quick patching method over sections torn up by construction crews and cracks have deepened as heavy construction vehicles have driven over and parked numerous days on the road and sidewalks alike.
  • Sidewalk or Curb RepairПризнана
    32 Seaview Avenue Malden, Massachusetts, 02148 - Malden Ward 5
    We recently had out side walk repaired ( on Baker Street) and while the side walks were getting repaired the folks damaged our side of the property on Baker Street (stone wall) and at the time we were told that they will just put it back without cementing it and after the side walk work is complete, they will cement it and put it back properly. It looks like they never cemented it back and this week it all came down again. I would appreciate if you would send someone to fix this. Please let me know if you need any further information.
  • Fall St PavingПризнана
    17 Fall Street Malden, MA, 02148, USA - Malden Ward 3
    Any update on when they will be returning for finish paving on Fall St? The edges are pretty rough right now and water was pooling after the recent rain. We had our cars parked elsewhere for the entire week 11/7-11/17 and no work was done.
  • 302-306 Pleasant St Malden, MA, 02148, USA - Malden Ward 2
    While walking with a neighbor who is in a wheelchair last night we found that there are no curb cuts in the sidewalk on either side of the driveway to the T parking lot. Could those please be added? My neighbor would like to travel to Malden center with less doubling back and less jaywalking.