Malden Local Notifications IYO

Fur Arrimaha: 217 Arrimaha xidhmay: 409 Arrimaha la Qiray: 53
  • 63 Robert'S Street Extension Malden, Massachusetts, 02148 - Malden Ward 8
    Hi, I previously submitted this issue. Recently there has been street repair near our area but they stopped right where the Roberts Street extension begins. I do not understand why. Our Robert Street extension is very uneven with big holes and patches of asphalt added by Nation grid when they did the gas line repairs. Could you please pave our extension street as well?
  • Malden MA, USA - Malden Ward 4

    I’m with Timothy! The only thing is …. THE PROBLEM ISN’T JUST AT THIS LOCATION! It is in several places across the city! I also ClickFixed recently about the Cross/Bryant St intersection/roadway and then noticed the exact same issue at Route 60 and Main Street! THIS IS JUST CRAZY! People don’t obey the lines and markings when they are painted! WITHOUT THEM THERE IS TOTAL CHAOS!

    Hoping the line painting is happening city-wide sooner rather than later! Leaving the roads as/is is EXTREMELY UNSAFE AND DANGEROUS for both pedestrians AND motorists! The sooner the painting takes place the safer we ALL will be!

    Thanks.

  • 93 Whitman Street Malden, Massachusetts, 02148 - Malden Ward 2

    Whitman street was paved probably about two months or so ago, and then they replaced sidewalks When is the contractor planning on coming back to put a final coat on the street? As it stands the road is messy, cones are everywhere, and the curbs are extremely high

    Appreciate any insight

  • 27 Oliver St Malden, MA, 02148, USA - Malden Ward 8
    Sewer backing up into house drain. The sewer line collapsed during construction on water line. Verified by drain service company with camera inspection.
  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • 298 Medford St Malden MA 02148, United States - Malden Ward 2
    When will the street be paved?
  • 139-177 Bainbridge St Malden, MA, 02148, USA - Malden Ward 5
    CITY NEEDS TO MARK SPEED BUMPS OR PROVIDE SIGNAGE CARS ARE SPEEDING AND GETTING BROKEN BC OF NO WARNING THIS IS NEW
  • 941 Main St Malden, MA, 02148, USA - Malden Ward 5
    Concerned about the newly traced lines on main street preparing itself for street painting. The traced lines indicate that there will be a bike lane on both sides? This eliminates parking on the even side and several cuts off parking on the odd side. Parking that is absolutely needed on Main Street. Please confirm.
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 1
    No lane lines. Took almost a month to pave a tiny strip of road that should have been a single day project. Now who knows when lane lines will be added.
  • Clifton St & Linden Ave Malden, MA, 02148, USA - Malden Ward 4
    This stop sign on the intersection of Clifton and Linden Ave. heading towards Main Street is set back from the road and we have seen a number of people blow right past it. Seems like an accident waiting to happen and have heard this from a number of other Maldonians. If possible to move closer to the road it would be much more visible.
  • 40 Claremont St Malden MA 02148, United States - Malden Ward 8
    I am again curious why road work is being done in the Linden School area and as a home owner in that area I find this out due to a detour sign in front of my driveway? Could you please notify the neighborhood before having a major detour running through it all day?
  • 174 Beltran St Malden MA 02148, United States - Malden Ward 3
    My personal property was damaged during the public sidewalk reconstruction yesterday. When removing the sidewalk concrete it seems the machine also completely lifted 8 ft of my front walkway which is now broken and cracked. How can this get repaired?