Malden Local Notifications PLUS

Mga Bukas na Isyu: 164 Mga Saradong Isyu: 384 Mga Na-acknowledge na Isy: 47
  • Malden MA - Malden Ward 3
    Please paint a "Stop Line" and the word "Stop" on the pavement at the intersection of Cushing Road and Chandler Road per Traffic Commission meeting 10/16/18.
  • Clifton St & Dexter St Malden, MA, 02148, USA - Malden Ward 3
    I just went by this morning and saw there is spray paint to mark out the replacement crosswalk across Dexter St. but there is no spray paint down to make the crosswalk that was across Clifton Street at the bus stop. This is a very crucial crosswalk to connect the neighborhood so I assume this was an oversight and wanted to make sure it was part of the final repainting plan.
  • PotholeKinilala
    141 Cross St Malden MA 02148, United States - Malden Ward 1
    3 or 4 Trenches in the road, my car takes a beating everyday on my commute to Work. There is one in front of the school which is no good, and 2 more right as you pass through the light change.
  • 81 Maplewood St Malden MA 02148, United States - Malden Ward 6
    Was wondering if the odd side of Maplewood Street will be getting new sidewalks like the even side did. Sidewalks are asphalt and are in poor condition from Gas station on corner up past the Webster Street/Maplewood intersections very difficult to walk on that side.
  • 151–199 Boylston St Malden MA 02148, United States - Malden Ward 7
    Sign down
  • OtherBuksan
    42 Autumn St Malden MA 02148, United States - Malden Ward 4
    Street is a mess. Dust is all over every house (inside and out) and car for weeks. Crews have not been back. Kids asthma and allergies are acting up. Probably the same for the elderly.
  • PotholeBuksan
    192-248 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3
    The street and sidewalks were opened up in April to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. Once we get into winter, the street is going to turn into a pothole nightmare when the patches get damaged by plows and freeze thaw. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. Finally, the asphalt patches on the concrete sidewalks were done in a very temporary method, so I would like to know when these will be permanently repaired with replacement segments of concrete for the segments that were saw-cut through. I know the state approved $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
  • PotholeBuksan
    62 Valley Street Malden, MA, 02148, USA - Malden Ward 6
    Who is paving and when?
  • 91 Medford St Malden, MA 02148, USA - Malden Ward 1
    Please replace the small single one-way sign at the corner of Madison and Medford St. heading to Bellrock with two(2) large signs as cars are trying to enter the one-way.
  • 106 Dexter Street Malden, Massachusetts, 02148 - Malden Ward 3
    sidewalk was never filled in after work was done resident has a blind daughter who walks this way (RL)
  • PotholeBuksan
    Summer St Malden, Massachusetts, 02148 - Malden Ward 4
    Will Summer Street be completely repaved from Glenwood to Pleasant this year?
  • 183 Exchange St Malden, MA 02148, USA - Malden Ward 4
    There is no "One Way" sign at the bottom of Abbott Street indicating that you can't turn right on Exchange Street. Saw two cars go the wrong way down Exchange within a couple minutes of one another this afternoon. Very dangerous.