  • Malden MA, USA - Malden Ward 4

    I’m with Timothy! The only thing is …. THE PROBLEM ISN’T JUST AT THIS LOCATION! It is in several places across the city! I also ClickFixed recently about the Cross/Bryant St intersection/roadway and then noticed the exact same issue at Route 60 and Main Street! THIS IS JUST CRAZY! People don’t obey the lines and markings when they are painted! WITHOUT THEM THERE IS TOTAL CHAOS!

    Hoping the line painting is happening city-wide sooner rather than later! Leaving the roads as/is is EXTREMELY UNSAFE AND DANGEROUS for both pedestrians AND motorists! The sooner the painting takes place the safer we ALL will be!

    Thanks.

  • 75 Cliff Street Malden, MA, 02148, USA - Malden Ward 6
    When is paving going to start?
  • 40 Claremont St Malden MA 02148, United States - Malden Ward 8
    I am again curious why road work is being done in the Linden School area and as a home owner in that area I find this out due to a detour sign in front of my driveway? Could you please notify the neighborhood before having a major detour running through it all day?
  • Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 4
    New crossing installed with detectable warning panels. There is a a 2 inch step from the sidewalk to the street making it inaccessible to mobility devices and defeating the purpose of a updated crossing.
  • Clifton St & Linden Ave Malden, MA, 02148, USA - Malden Ward 4
    This stop sign on the intersection of Clifton and Linden Ave. heading towards Main Street is set back from the road and we have seen a number of people blow right past it. Seems like an accident waiting to happen and have heard this from a number of other Maldonians. If possible to move closer to the road it would be much more visible.
  • Poplar St Malden, MA, 02148, USA - Malden Ward 5
    Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
    We are not able to keep our windows open because of the dust from the construction.
  • 941 Main St Malden, MA, 02148, USA - Malden Ward 5
    Concerned about the newly traced lines on main street preparing itself for street painting. The traced lines indicate that there will be a bike lane on both sides? This eliminates parking on the even side and several cuts off parking on the odd side. Parking that is absolutely needed on Main Street. Please confirm.
  • 23 Glenmere Ave Malden MA 02148, United States - Malden Ward 8
    Paving company left without fixing the sidewalk in front of our driveway with sharp edges that keep damaging our vehicles
  • 27 Oliver St Malden, MA, 02148, USA - Malden Ward 8
    Sewer backing up into house drain. The sewer line collapsed during construction on water line. Verified by drain service company with camera inspection.
  • 426 Bryant St Malden MA 02148, United States - Malden Ward 7
    Any idea when the work on Bryant and Ferry Streets is going to be completed? This sign laying in the middle of the sidewalk for days on Bryant Street is a safety issue!
  • 67 Bryant St Malden MA 02148, United States - Malden Ward 5
    The completion of these sidewalk sections has been incomplete for months. What is the hold up?
  • Willow St Malden, MA, 02148, USA - Malden Ward 7
    Hoping the Willow/Cross/Bryant Street intersection is going to be painted SOON! We need this DESPERATELY! Without a solid line down the middle, stop lines at the lights and crosswalks it is an extremely dangerous area! Thanks.