City of Hammond PLUS

Open Issues: 893 Closed Issues: 118,198 Acknowledged Issues: 2,066
  • 4810 Oak Ave Hammond, Indiana, 46327 - Hammond
    Tree roots pushing up sidewalk. Making it uneven/tripping hazard
  • 2523 New York Ave Whiting, Indiana, 46394 - Hammond
    Sidewalk is damaged due to tree roots.
  • 4026 Johnson Ave Hammond, Indiana, 46327 - Hammond
    Tree roots need to be removed first before sidewalk can be fixed
  • 1249 Davis Ave Whiting, Indiana, 46394 - Hammond
    Sidewalk- Tree roots , uneven and tripping hazard
  • 5556 Pointe Dr Hammond, Indiana, 46320 - Hammond
    Sidewalk -Tree roots pushing up sidewalk. Uneven/Tripping hazard
  • Nw Corner Of 167th & Waveland Hammond, Indiana, 46323 - Hammond
    Sidewalk sinking. About 3.5 inches by my measurements Trip hazard & water drain issue..
  • 608 Cherry St Hammond, Indiana, 46324 - Hammond
    Sidewalk uneven/tripping hazard
  • 2107 Stanton Ave Whiting, Indiana, 46394 - Hammond
    Tree roots lifting up sidewalk. uneven/tripping hazard
  • 2006 Lincoln Ave Whiting, Indiana, 46394 - Hammond
    Tree roots pushing up sidewalk. Uneven/tripping hazard
  • 7519 Missouri Ave Hammond, Indiana, 46323 - Hammond
    Tree roots pushing up concrete slab. Uneven/tripping hazard
  • 6525 Kennedy Ave Hammond, Indiana, 46323 - Hammond
    Sidewalk needs repairing on Downey Pl side
  • 4506–4532 Torrence Ave Hammond IN 46327, United States - Hammond
    First it was the bike path, now, Torrence Ave was the only street that did not have the railroad crossing repaved like Henry and Johnson have.
    There is a huge pothole with gravel that hasn't been repaved, meanwhile the exact same maintenance two streets over has. The construction equipment that weighs pounds is sitting on top of my water pipe that the city will try to blame me for if it's damaged. Please please please look into repaying this street so that we don't have tons of pounds sitting on our pipes. Please repave the gravel as you did with the streets adjacent. Please don't tell me the project is under bid in 2019 and still not have an answer in 2024...
    Please continue your bike path project..