Corona PLUS
Open Issues: 96
Closed Issues: 53,842
Acknowledged Issues: 949
-
Sidewalk/Curb MaintenanceAcknowledged1950 Railroad St Corona, CA 92880, USA - Coronano ramp. otherside of intersection has a ramp.
-
718 Bonanza Cir Corona, California, 92879 - CoronaOur street was recently resurfaced but was not properly sealed or some other issue. I have been sweeping up a bucket of loose rocks every week since the resurfacing was completed.
-
2201 S Lincoln Ave Corona CA 92882, United States - CoronaThere are major potholes going east, with one on each end of the church and one more entering the left-hand turning lane. It's clear that they have been repaired numerous times, but the job has not been done properly. Why have all the surrounding streets been repaved, but this section, which is the worst, has been neglected?
-
1387-1681 California Ave Corona, CA, 92881, USA - CoronaSeries of potholes and cracking road across the entire lane in the bend of the road going towards Rimpau Ave.
-
Deer Hollow Dr & Noble Way Corona, CA, 92882, USA - CoronaThere was an underground water pipe repair done in front of my home several months ago. The repair crew had to break the asphalt to access the water line.
The repair was not done with a clean outcome. The asphalt is broken-up, and there are paint markings on the slury seal in front of my home.
This is my second submission about this issue. The area in front of my home (adjacent to my mailbox post, and into the middle of the street) looks very bad. -
Tilson Cir Corona, CA, 92882, USA - CoronaRequesting repairs to the street. Lots of erosion and cracks. Also, the man holes have major cracks/damage. Requesting them to be replaced.
-
1020 Blue Crest St Corona, CA 92882, USA - CoronaAlley Way Resurfacing - What is the new expected completion date? I got a notice on my door that this project would be worked on from beginning of October to the end of October. It's now the end of November and it's still not close to being completed. I lost use of my driveway and garage and need to be able to do some maintenance on my vehicle but can't get into my garage. Now with the weather getting bad, is there going to be more of a delay? Did the vendor provide a bid with a completion date? Are they not being held to their contract requirements of completion? Maybe they should complete an area before they move on to the next.
-
Palisades Dr Corona CA 92882, United States - CoronaAsphalt (bike lane) is broken into large pieces and eroding down the hill
-
E Ontario Ave & California Ave Corona, California, 92881 - CoronaSouthern California Edison completed a project on Ontario Ave s/o California Ave and continuing west. Two vaults were set and trench was excavated between them. The street was only base paved and the final cap and striping was not completed. It's been approximately two months since the base pave. This has created unsafe conditions for pedestrians as well as to motorists.
-
Street Striping/Curb PaintingAcknowledged2775 Montoya Dr Corona, CA 92882, USA - CoronaThe intersection of Montoya Drive and Highgrove needs to have the crosswalk and street divider (on Montoya between Cadiz and Highgrove) repainted please.
-
Street Striping/Curb PaintingAcknowledged701–731 S Washburn Ave Corona CA 92882, United States - CoronaWas wondering when the crosswalk and stop behind line are going to be painted at this intersection They are and have been marked for quite some time, but no official paint