Corona PLUS

Open Issues: 96 Closed Issues: 53 843 Uppmärksammade Ärenden: 948
  • 1950 Railroad St Corona, CA 92880, USA - Corona
    no ramp. otherside of intersection has a ramp.
  • 2489 Mesquite Ln Corona CA 92882, United States - Corona
    The streets are visibly deteriorating along border, with tree roots causing chunks of asphalt to be forcefully separated.
  • 1401-1439 Deer Hollow Dr Corona, CA, 92882, USA - Corona
    There is an Underground water pipe leaking and causing constant water to pool on the road at the corner of Mangular and Deer Hollow Dr.
  • 1387-1681 California Ave Corona, CA, 92881, USA - Corona
    Series of potholes and cracking road across the entire lane in the bend of the road going towards Rimpau Ave.
  • Deer Hollow Dr & Noble Way Corona, CA, 92882, USA - Corona
    There was an underground water pipe repair done in front of my home several months ago. The repair crew had to break the asphalt to access the water line.
    The repair was not done with a clean outcome. The asphalt is broken-up, and there are paint markings on the slury seal in front of my home.
    This is my second submission about this issue. The area in front of my home (adjacent to my mailbox post, and into the middle of the street) looks very bad.
  • E Ontario Ave & California Ave Corona, California, 92881 - Corona
    Southern California Edison completed a project on Ontario Ave s/o California Ave and continuing west. Two vaults were set and trench was excavated between them. The street was only base paved and the final cap and striping was not completed. It's been approximately two months since the base pave. This has created unsafe conditions for pedestrians as well as to motorists.
  • Palisades Dr Corona CA 92882, United States - Corona
    Asphalt (bike lane) is broken into large pieces and eroding down the hill
  • 100 E Harrison St Corona CA 92879, United States - Corona
    Road is very bumpy and needs to redone.
  • 1020 Blue Crest St Corona, CA 92882, USA - Corona
    Alley Way Resurfacing - What is the new expected completion date? I got a notice on my door that this project would be worked on from beginning of October to the end of October. It's now the end of November and it's still not close to being completed. I lost use of my driveway and garage and need to be able to do some maintenance on my vehicle but can't get into my garage. Now with the weather getting bad, is there going to be more of a delay? Did the vendor provide a bid with a completion date? Are they not being held to their contract requirements of completion? Maybe they should complete an area before they move on to the next.
  • 2775 Montoya Dr Corona, CA 92882, USA - Corona
    The intersection of Montoya Drive and Highgrove needs to have the crosswalk and street divider (on Montoya between Cadiz and Highgrove) repainted please.
  • 701–731 S Washburn Ave Corona CA 92882, United States - Corona
    Was wondering when the crosswalk and stop behind line are going to be painted at this intersection They are and have been marked for quite some time, but no official paint
  • 400 Bristol Way Corona, CA 92879, USA - Corona
    Corona PD and City of Corona Traffic Engineering Griffin Way and Bristol Way are out of control! Approximately 19:25 my dog and I were almost hit while crossing in the crosswalk. First while crossing Griffin Way towards the park and then again when I crossed to go home.
    Driver's are NOT STOPPING and SPEEDING.
    Is it really going to take a death of someone before you do anything? Over the years I have complained ad nauseam and not much has been done about this problem which continues to get worse even though this intersection is "On rotation".
    Recently my neighbor Hugo told me he was nearly run down with his dog while trying to cross the street. And there are other neighbors who've also nearly been run down. I've seen other complaints about this.
    People are NOT STOPPING. People ARE SPEEDING.
    Do something to stop it besides the rare occasion of a motor for a short time.