City of Medford PLUS

Open Issues: 755 Closed Issues: 19.823 Αναγνωρισμένα Θέματα: 1.907
  • 22 Bradlee Road Medford, Massachusetts, 02155 - Medford
    Noise Complaint - 26 Bradlee Road construction crew plays loud music on speakers within the units they are working in. The noise is bothersome to all tenants living within the building. Escalated to Building property manager but no action was taken.
  • 110 College Avenue Medford, Massachusetts, 02155 - Medford
    Barrels still out. Overflowing. Also trash is mixed in and added to the recycling bins.
  • 59 Marshall St Medford MA 02155, United States - Medford

    Construction company working on 54 Lyman completely destroyed the street, curb and pavement two houses down on Marshall street

    The picture above makes it look tame. The gash is 10-15 ft long and 3-4ft wide. The curb was destroyed as well as the asphalt street.

  • Demolition or ConstructionΑναγνωρισμένο
    1 Summit Rd Medford, MA, 02155, USA - Medford
    A wall was hit by a car about two years ago. The City sent a crew to remove the fallen stones but it the wall has not been repaired. It is located between 1 & 3 Summit Rd. It has been reported a couple of times in the past two years.
    Please repair it before the snow comes.
    Thanks
  • Demolition or ConstructionΑναγνωρισμένο
    Freedom Way - Medford
    This big and random piece of metal has been abandoned here on Freedom way for about two years now and is just enough in the way of traffic that it could damage cars or even people passing by. It also makes it difficult to make a safe right turn onto Riverside Ave when exiting the school property. This is careless and needs to be removed asap.
  • 10 Winthrop St Medford MA 02155, United States - Medford
    Side walk is closed with no alternative for pedestrians Also not fenced off
  • 17 St Denis Ave Medford, MA 02155, USA - Medford
    long periods of jackhammering noise all day long.
  • Sidewalk IssueΑναγνωρισμένο
    1-53 Swan St Medford, MA, 02155, USA - Medford

    This is more a complaint about these so called "tactile pads" in general. When they fall apart, either from aging and weathering or being run over by a snowplow, those little nibs of plastic or rubber pose a contamination threat to nearby soils and streams. Perhaps there is a better material or design that would accomplish the same goal?

    I mention this now, because they are talking about putting even more of these, on High Street.

  • Roadwork / Street Construction TopicsΑναγνωρισμένο
    River'S Edge Dr Medford, MA, 02155, USA - Medford
    Driving down River’s Edge Dr has become very dangerous now that most drivers treat this as a two lane road. The lines need to be repainted. Over the past many months, I’ve almost gotten into many accidents, I have to drive through this area frequently and now often consider taking a different route because I’ve encountered too many aggressive drivers who speed past and pass on the right. This really needs to be a priority.
  • Roadwork / Street Construction TopicsΑναγνωρισμένο
    331-399 River'S Edge Dr Medford, MA, 02155, USA - Medford

    [Day 30 of almost getting side swiped by aggressive drivers] People consistently create the bike lane as a second lane since the signage and road line markings are worn down and faded. This is incredibly dangerous for those using the bike lane.

    Doesnt look like this is going to be solved or acknowledged any time soon. So i guess we'll pretend this issue doesnt exist. Until next time..

  • Roadwork / Street Construction TopicsΑναγνωρισμένο
    331-399 River'S Edge Dr Medford, MA, 02155, USA - Medford
    [Day 22 of almost getting side swiped by aggressive drivers] People consistently create the bike lane as a second lane since the signage and road line markings are worn down and faded. This is incredibly dangerous for those using the bike lane. Until next time..
  • Roadwork / Street Construction TopicsΑναγνωρισμένο
    Riverside Ave @ Locust St Medford, MA 02155, USA - Medford
    please repave! This stretch of road is a disaster