Town-Wide Issues PLUS
Open Issues: 448
Closed Issues: 54,703
Acknowledged Issues: 363
-
3871–3889 S Quartz St Gilbert AZ 85297, United States - GilbertThere are no detour signs directing traffic throughout the neighborhood Please place signs asap! Thx
-
3830 E Encinas Ave Gilbert AZ 85234, United States - GilbertLight pole is rusting through and is beginning to lean towards the street. Light pole is in the front yard of 3821 E Encinas Ave.
-
S Higley Rd Gilbert, AZ, 85295, USA - Gilbertdriving south on higley through the intersection of pecos, there is a huge bump in the road which causes the vehicle to have a huge bounce if you're in the right or middle lane, drivers have to break during a green light to slow down to avoid being thrown around inside of their cars, please address this. Almost feels like the car is flying if you hit that bump going 45mph
-
1637-1641 W Guadalupe Rd Gilbert, AZ, 85233, USA - GilbertEastbound "no turn on red" sign missing, the lower sign by the Volero gas station is missing
-
1025 S Gilbert Rd Gilbert AZ 85234, United States - Gilbert
No left turn sign abandoned in parking lot
Second request
Thank you!! -
425 N Greenfield Rd Gilbert, Arizona, 85234 - GilbertIn front of Christ's Greenfield Lutheran Church. A caller reported the signals on the school zone sign that normally flash during school hours aren't flashing.
-
1700–1790 E Lafayette Ct Gilbert AZ 85298, United States - GilbertAnother fire hydrant marker reflector off the road in a common area
-
N Higley Rd Gilbert AZ 85234, United States - GilbertThe light at Higley and Michelle cycled with no vehicles waiting on Michelle. Is it possible to check the sensors to make sure they are not being tripped without vehicles present or tripped by someone turning right? There shouldn't be a red for Higley without side traffic waiting.
-
5202 E Baseline Rd Gilbert, AZ, 85234, USA - GilbertLEFT TURN SIGNAL IS NOT CYCLING PROPERLY TO GO E/B ON BASELINE/HIGLEY
-
16989-17193 E Warner Rd Gilbert, AZ, 85296, USA - GilbertThe Gabriella pointe side lanes have been blocked off and the holes dug to work on the roads and pave the sides. It's been since December. We are halfway through March. When will these be paved? It seems there's an endless sea of orange cones and no end in sight. And why does it take weeks to do once they actually start? Lay the gravel, flatten it, build it up and pave it. Shouldn't take more than a week. Instead it takes weeks and months to do. Get it fixed please.