Descrizione
I waited for at least two weeks wanting to see if the contractor who was replacing the lead pipes in the streets to the homeowner area might do a better job at filling in the sidewalk. It has not been done. There is a big dip (not completely filled in) where they opened up the sidewalk. Can this be more leveled to meet the sidewalk. Afraid someone will lose balance while walking up and down this side of street.
7 Commentos
Malden, MA (Ufficialità verificata)
Robert P. Knox Jr. (Director of Public Works) (Ufficialità verificata)
Malden, MA (Ufficialità verificata)
Kay M (Utente registrato)
Kay M (Utente registrato)
Chiusa Yem Lip (Director of Engineering) (Ufficialità verificata)
Kay M (Utente registrato)