الوصف
Hi, Why can't Cottage Grove get a sidewalk if they want one ? I am sure you have many inquiries from Mr McGrath but really - how does he go about this ?
Does he need get get a signed petition from neighbors ?
This is how I finally got VT GAS to run a pipeline onto our street. Of course, they get revenue from it and the city does not get revenue from a sidewalk BUT it is what the city SHOULD do for their citizens.
سئل أيضا...
Q. Is there a problem with the sidewalk condition or is something blocking the sidewalk?
A. لا جواب نظرا
A. لا جواب نظرا
16 تعليقs
Jason (مستخدم مسجل)
Gil (مستخدم مسجل)
Keegan Carter (مستخدم مسجل)
I'm not sure the lots / spacing was originally designed for it you would either be cutting into peoples front yards on cottage grove or their back yards on loaldo. I think you would have a heck of an up hill fight either way to convince all parties to go for it.
I'm assuming this request comes from a want for safer streets for the kids to walk on so a secondary easier to pursue approach might be to get some speed bumps. Alternatively since people speed so hard on cottage grove kids could side track on Green Acres or Loaldo to get out to north ave?
Jude (مستخدم مسجل)
Jude (مستخدم مسجل)
Gil (مستخدم مسجل)
Jude (مستخدم مسجل)
Gil (مستخدم مسجل)
تم إقراره DPW Pine Customer Service (تم التحقق رسميا)
Jude (مستخدم مسجل)
Burlington, VT (تم التحقق رسميا)
Gil (مستخدم مسجل)
Jude (مستخدم مسجل)
Jude (مستخدم مسجل)
SCormier (Verified Official)
Thank you for your interest in our City’s sidewalks. In order for the DPW to inspect sidewalk condition we must receive a Request For Service (RFS). These can be submitted through either Customer Service (802) 863-9094 or through See, Click, Fix at http://en.seeclickfix.com/burlington_2. Once the request has been processed, it will be added to our list of locations to be inspected. After the sidewalk has been inspected, it gets evaluated for the type of repair needed and added to our system.
We are currently experiencing a 2-3 year backlog on sidewalk requests due to a severely underfunded sidewalk program. This list is typically addressed in chronological order from oldest to newest request with exceptions for sidewalk repairs that are deemed a significant safety hazard or repairs that are part of another planned project already scheduled.his issue also to let us know you have received it , it is in que and it is being considered ?