Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Engineering Department re-inspected the site on 9/22/2021. Based on our inspection of the condition of the sidewalk, this site has been elevated to our CLAIMS list. We have determined that the sidewalk, and driveway aprons do need to be replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted, nevertheless, this area must be corrected. MGK
Sidewalk needs to be repaired and tree that is the issue on damage needs to be removed. Tree was only pruned back which defeats the purpose. Neighbors have complained and someone is going to get hurt.
4 Comments
Hamden, CT (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Engineering Inspector (Verified Official)
Cristina (Registered User)