The Engineering Department re-inspected the site on 10/20/2021. We have determined that the sidewalks and curbs do need to be repaired/replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The site has been added to our master list for repairs.
3 Commentaires
Hamden, CT (Membre officiel vérifié)
Engineering Inspector (Membre officiel vérifié)
Reconnu Engineering Inspector (Membre officiel vérifié)