Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Engineering Department re-inspected the site on 10/27/2021. This street poses an
interesting issue due to the asphalt sidewalks. We have determined that the sidewalks do need to be repaired/replaced - on both sides of the road to correct the situation. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The site has been added to our master list for repairs.
3 تعليقs
Hamden, CT (تم التحقق رسميا)
تم إقراره Staff Engineer (تم التحقق رسميا)
Engineering Inspector (تم التحقق رسميا)
interesting issue due to the asphalt sidewalks. We have determined that the sidewalks do need to be repaired/replaced - on both sides of the road to correct the situation. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The site has been added to our master list for repairs.