Beschreibung
A crosswalk should be painted at Fairview and West Side. This was an issue raised 4+ years ago during a walking study of the corridor. This is already a place where pedestrians have the right-of-way and accessible ramps are already installed.(Crosswalks exist at all legs of all intersections unless they have a sign that prohibits pedestrian crossing.) Please mark the crosswalk to signal to drivers that they just yield to pedestrians and to signal that cars cannot be parked blocking the corner ramps.
auch gefragt...
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
3 Kommentierens
Jersey City, NJ (Verifizierter Beamter)
Anerkannt Traffic – Jennifer C (Verifizierter Beamter)
Geschlossen Engineering - Althea (Verifizierter Beamter)