Descrizione
There are 3 sewer on this corner They are all clogged and the area floods with every rain It was an ice rink all winter Heavy rains cause overflow into my basement, probably because marble Ave was skipped in the storm/sewer Hampden st project
6 Commentos
Chicopee, MA (Ufficialità verificata)
M C (Ufficialità verificata)
Kapusta (Utente registrato)
Doug Ellis (Ufficialità verificata)
Doug Ellis (Ufficialità verificata)
Riconosciuto Quinn Lonczak, Project Supervisor (Ufficialità verificata)