说明
Fire Marshall Inspector Zavodjancik reported that the management is fixing three units, the ceilings have been demo and electrical wiring as well. The electrical panel in one unit was ripped out, wires are hanging all over.
Fire Marshall Inspector Zavodjancik reported that the management is fixing three units, the ceilings have been demo and electrical wiring as well. The electrical panel in one unit was ripped out, wires are hanging all over.
3 评论s
已确认 Bridgeport, CT (官方验证)
Administrative Specialist-Tamar Morales (官方验证)
Building Official 4-Grabowski (官方验证)
5/5/22 Site Visit: 12:00 PM
Talked to Property Manager (Ethan Szabo) / Stop Work Order was posted by Sean Masi.
Told Mr. Szabo that no additional work can be done until a Building Permit is issued.