Descripción
The entire freeway on the South side of the 3500 South bridge on I-215 has at least a 3" drop off. It's damaging my car and slowing traffic considerably. Please fix this.
The entire freeway on the South side of the 3500 South bridge on I-215 has at least a 3" drop off. It's damaging my car and slowing traffic considerably. Please fix this.
5 Comentars
UDOT Administration (Oficial verificado)
Reconocido UDOT Region 2 (Oficial verificado)
UDOT Region 2 (Oficial verificado)
Becky - UDOT Communications (Oficial verificado)
Cerrado Ashlee - UDOT Region 2 Operations (Oficial verificado)
Thank you for taking the time to contact us regarding your concerns.
This issue has been resolved.
Thank you!