Description
The entire freeway on the South side of the 3500 South bridge on I-215 has at least a 3" drop off. It's damaging my car and slowing traffic considerably. Please fix this.
The entire freeway on the South side of the 3500 South bridge on I-215 has at least a 3" drop off. It's damaging my car and slowing traffic considerably. Please fix this.
5 Commentaires
UDOT Administration (Membre officiel vérifié)
Reconnu UDOT Region 2 (Membre officiel vérifié)
UDOT Region 2 (Membre officiel vérifié)
Becky - UDOT Communications (Membre officiel vérifié)
Clos Ashlee - UDOT Region 2 Operations (Membre officiel vérifié)
Thank you for taking the time to contact us regarding your concerns.
This issue has been resolved.
Thank you!