Descrição
Is there a schedule or timetable to add a lane (widen) E/B Ocotillo Rd between 148th Street and Val Vista? The former agriculture field on the south side of Ocotillo has been graded for roads and residential. There are power poles that need to be moved before a curb lane, bicycle lane and sidewalk can be completed. Any estimate will help. Thanks
4 Comentários
Gilbert 311 (Oficial Verificado)
Engineering - Debbie 🚦 (Oficial Verificado)
Gilbert 311 (Oficial Verificado)
Engineering - Tom (Oficial Verificado)