Mô tả
Is there a schedule or timetable to add a lane (widen) E/B Ocotillo Rd between 148th Street and Val Vista? The former agriculture field on the south side of Ocotillo has been graded for roads and residential. There are power poles that need to be moved before a curb lane, bicycle lane and sidewalk can be completed. Any estimate will help. Thanks
4 Bình luậns
Gilbert 311 (Chính thức đã xác nhận)
Engineering - Debbie 🚦 (Chính thức đã xác nhận)
Gilbert 311 (Chính thức đã xác nhận)
Engineering - Tom (Chính thức đã xác nhận)