الوصف
We have erosion, runoff and standing water caused by the Siena Townhome stormwater today. We are asking the town to come up with a stormwater plan and resolve per the UDO. This issue was created by the developer and we need the towns assistance to come up with a plan.
7 تعليقs
Wake Forest, NC (تم التحقق رسميا)
Engineering - K Kirsch (تم التحقق رسميا)
Ann Theberge (مستخدم مسجل)
تم إقراره Engineering - M Sarna (مستخدم مسجل)
Ann Theberge (مستخدم مسجل)
Ann Theberge (مستخدم مسجل)
ORGANIZATIONAL PERFORMANCE - Ortiz (تم التحقق رسميا)