Description
We have erosion, runoff and standing water caused by the Siena Townhome stormwater today. We are asking the town to come up with a stormwater plan and resolve per the UDO. This issue was created by the developer and we need the towns assistance to come up with a plan.
7 Commentaires
Wake Forest, NC (Membre officiel vérifié)
Engineering - K Kirsch (Membre officiel vérifié)
Ann Theberge (Utilisateur inscrit)
Reconnu Engineering - M Sarna (Utilisateur inscrit)
Ann Theberge (Utilisateur inscrit)
Ann Theberge (Utilisateur inscrit)
ORGANIZATIONAL PERFORMANCE - Ortiz (Membre officiel vérifié)