This is an unaffiliated request
واعترف من قبل: City of Quincy

Quincy Shore Drive - Quincy Bay "When will the channel be dredged?" تم إقراره

646 & 692 Quincy Shore Drive Quincy, MA عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

130782

Submitted To:

الجماعة

فئة:

لا يوجد

شاهدوا:

5938 مرات

حي:

Quincy

ذكرت:

في

الوصف

There are two yacht clubs along Quincy Shore Drive. Both clubs can be accessed from the water by a common channel; however the channel has filled with sand from the ongoing DCR beach maintenance project. At low tide people cannot go back and forth to their boats because the water in the channel is too low. Rumor has it that money had been set aside by the State of Massachusetts to dredge the channel, however within the City of Quincy there seems to be a problem prioritizing the job.
The yacht clubs have members who are working class citizens and retirees. Dues are not high but members are expected to put in work hours to maintain the building and programs. The City of Quincy collects taxes on the boats moored in the harbor by the clubs, however it seems the City of Quincy does not want to take responsibility for maintaining the water way. If the City of Quincy were to facilitate dredging that water way, .construction workers would be employed.

From a safety point of view having the channel open would allow emergency marine equipment and manpower quick access to the city intra structure.


  • مغلق Chris Cassani (مستخدم مسجل)

  • Pam (ضيف)

  • فتح Chris Cassani (مستخدم مسجل)

  • تم إقراره Chris Cassani (مستخدم مسجل)

  • YesIpaytaxes (مستخدم مسجل)

  • Swamped (ضيف)

  • Tom (ضيف)

  • Chris Cassani (مستخدم مسجل)

تعليق جديد

تغييرات الحالة العامة غير متاحة لهذه المشكلة.