Mas magaling ang SeeClickFix kasama ang mga kalapitbahay
Imbitahan ang iyong mga kapitbahay at kaibigan na gamitin ang SeeClickFix upang sila ay makapagpahayag, makaboto at makapagkomento tungkol sa mga isyu sa inyong lugar at lungsod.
Note from the alderman's office: "This was not done by CDOT . Work might have been done through the park district. CDOT will check for permits and advise Alderman."
I can understand the lack of repair over the winter. However, spring is now here and this should get corrected soon - if the responsible contractor can be identified and located.
This still isn't fixed. The alderman said they are trying to find out who was responsible for this installation. The city should fix it, and then go over and charge whoever was responsible.
I wonder how long this will be kept open. I would like to be told that it isn't going to be fixed so quit keeping this open - the city or the park district will not spend time and money fixing this very obvious problem.
This complaint is still being ignored. It's been reported to the 39th Ward alderman's office, who say it's going to get repaired but it still hasn't been repaired.
Waiting to get fixed. It's still a hazard and difficult if not impossible to get over on a wheelchair, a big bump on a bicycle. Winter is coming, it would be helpful if this got fixed before the snow.
This is still not repaired. The west side of the street is correct, but the east side has a very large bump making it difficult to cross with a wheelchair or stroller. It's coming into spring and this issue needs to be fixed by whatever city agency is responsible. Attached is a picture of the WEST side, what the pedestrian ramp is supposed to look like.
This is still not fixed. It's almost a year now since this was first reported after it was incorrectly installed after street work. The west side is smooth and installed correctly. The east side has a large bump that a person on a wheelchair couldn't cross. The picture shows debris collecting along the large curb bump.
This still has not been repaired, and it's almost three years. The damage was done when sewer work and repaving was done three years ago. The contractor who did the work should be contacted and required to repair the work done incorrectly.
22 Komentos
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Bob (Rehistradong User)
Isinara Bob (Rehistradong User)
Bob (Rehistradong User)