THIS IS NOT A DUPLICATE OF ISSUE ID 13019226.
That issue requires moving the pole on the south side.
THIS issue is about the non-working lights on both sides of Pavonia Ave..
I previously reported this on 22 November as Issue ID 11712358.
It was wrongly closed and archived by Sean G. as a duplicate of 13019226, so nothing was done and the lights are still not working.
At Pavonia & Homestead there is a Rectangular Rapid-Flashing Beacon (RRFB) installation that pedestrians can actuate when they want to cross Pavonia Ave.
There are two signals, one at each end of the crosswalk, which have yellow LED lights to warn oncoming vehicles.
A button is mounted on each pole below the beacons and signs.
Both sides normally flash when either button is pressed.
This is the ONLY signalized crosswalk in the middle of the 600 block of Pavonia Ave.
The north AND south lights and buttons are NOT working.
The lights on BOTH sides should flash when EITHER button is pressed, but they don't.
51 Comentários
Jersey City, NJ (Oficial Verificado)
FixItNow (Utilizador Registado)
JCMakeItWork (Utilizador Registado)
ChadThunder (Utilizador Registado)
They make it less walkable and more dangerous to pedestrians
ChadThunder (Utilizador Registado)
ChadThunder (Utilizador Registado)
Encerradas Traffic - Sean G (Oficial Verificado)
JCMakeItWork (Utilizador Registado)
Reaberta FixItNow (Utilizador Registado)
FixItNow (Utilizador Registado)
Traffic - Sean G (Oficial Verificado)
Encerradas RRC Assistant Director - Waseem (Oficial Verificado)
Reaberta ChadThunder (Utilizador Registado)
It is a problem in winter
ChadThunder (Utilizador Registado)
It seems to me that no one wants to step up and keep themselves accountable
ChadThunder (Utilizador Registado)
This is what's going to happen, you're going to make sure that there's power to this device at all time, day or night.
And this is the last time we talk about this.
You don't try to pawn this off or think how you get away with this.
Until then, this issue is NOT resolved yet and needs to stay OPEN.
ChadThunder (Utilizador Registado)
Reconhecida Traffic – Jennifer C (Oficial Verificado)
ChadThunder (Utilizador Registado)
The nearby new apartment construction obstructs most of the surrounding pedestrian side walks.
If you're here in person, you would even be horrified to cross the street during the day, not alone at night.
jerseyflea (Utilizador Registado)
One RRFB manufacturer offers a free solar assessment for installations:
https://www.youtube.com/watch?v=UlcCpaZQPKo&t=4s
There are also larger solar panels available for RRFBs.
JCMakeItWork (Utilizador Registado)
Traffic – Jennifer C (Oficial Verificado)
A raised crosswalk along with the installation of a HAWK signal (a traffic signal for pedestrians) are proposed at this crossing as part of the construction project along the north side of Pavonia Ave. We are currently working with the developer to finalize the design and hope to expedite the timeline of these improvements. In the interim, we are getting quotes to understand the cost of hard wiring the RRFBs.
JCMakeItWork (Utilizador Registado)
ChadThunder (Utilizador Registado)
Thank you Moira as well for helping our neighbors out by voicing our concerns.
jerseyflea (Utilizador Registado)
We installed some HAWK signals when I worked in the NYC DOT Signal Shop.
HAWK signals need additional signage to explain the meaning to drivers and pedestrians.
This is an illustration of an optimal installation with R10-23A and W11-2S signs:
https://cdn5-hosted.civiclive.com/UserFiles/Servers/Server_15209001/File/Departments/Transportation/Sign%20Standards/Updates/SS-108B.pdf
ChadThunder (Utilizador Registado)
ChadThunder (Utilizador Registado)
jerseyflea (Utilizador Registado)
ChadThunder (Utilizador Registado)
Traffic – Jennifer C (Oficial Verificado)
jerseyflea (Utilizador Registado)
There are 3 storm drains at the intersection.
It will be a challenge to raise the crosswalk and maintain proper drainage.
jerseyflea (Utilizador Registado)
Jennifer C.,
This evening (Thursday to Friday) contractors were working to raise the 3 storm drains.
I also saw equipment for milling the old asphalt at the intersection and repaving it.
Will a new HAWK signal system and signage be installed or will the RRFBs be retained instead?
jerseyflea (Utilizador Registado)
This Wikipedia page has useful information about the HAWK beacon:
https://en.wikipedia.org/wiki/HAWK_beacon
jerseyflea (Utilizador Registado)
jerseyflea (Utilizador Registado)
This intersection was recently repaved.
It needs new zebra stripes for the pedestrian crosswalk.
jerseyflea (Utilizador Registado)
ChadThunder (Utilizador Registado)
ChadThunder (Utilizador Registado)
JCMakeItWork (Utilizador Registado)
ChadThunder (Utilizador Registado)
Engineering - Althea (Oficial Verificado)
I would like to go missing! Please do not try to find me.
This issue started on 12/1/2022 and I don't even know if the original request about a pole removal happened.
The developer and our technician were stopped from hard wiring the RRFBs, so we are now changing the batteries every two weeks. Very frustrating.
In the mean time, Mike Manzela is pushing Planning to update the intersections now (at developers expense).
Where are we now? What do you all want to know?
jerseyflea (Utilizador Registado)
Althea,
The request to move the south RRFB pole to make it more visible is here:
https://seeclickfix.com/issues/13019226
I originally posted THIS issue to get the RRFBs repaired.
The discussion evolved into a promise for a HAWK installation at the intersection.
There has been no response from Traffic since Jennifer C posted on 15 Feb 2023.
I don't want to close this issue until the HAWK signal is installed.
Engineering - Althea (Oficial Verificado)
That is what I thought.
I thought maybe we could keep this issue permanently open so all of the conversations on longer term solutions could be here and all immediate maintenance issues could be elsewhere.
I will see what I can get from the traffic engineers.
Engineering - Althea (Oficial Verificado)
Engineering - Althea (Oficial Verificado)
Engineering - Althea (Oficial Verificado)
I am bundling these because it is about safely crossing the street.
Finally, we are getting real movement. The developer was to place a traffic light here along with a 20' wide crosswalk. They have been told that they must make good on the promise they made when having their building/site plans approved.
I have to thank you all, because the push by the residents, Councilman Boggiano's office, the JSQ SID, Traffic Engineering and City Planning.
I wanted to cry every time, after rush hour, that I witnessed pedestrians, who were really careful, almost get hit by vehicles (a half block away!!!!!) almost get hit.
I do not have a timeline yet, but having City Planning aggressively following up on this, is a huge ray of sunshine. I will update you when I have more info.
jerseyflea (Utilizador Registado)
Althea,
I did some research and found the open data set for the Homestead Place Extension project:
https://data.jerseycitynj.gov/explore/dataset/planning-board-application-p22-212-homestead-place-2023/information/
This is the most recent version of the plans for the intersections:
Homestead Place Extension Improvements Civil Plans 2022-12-07 HPE PB Set dsig.pdf
Scroll down to the 2nd drawing: SITE PLAN SECTION 1
.
The improvements to Pavonia and Homestead on the left side of the drawing has a note:
EXISTING RRFB BEACONS TO REMAIN;
INTERSECTION TO BE UPGRADED BY SIGNAL;
DESIGN BY OTHERS
The type of traffic signal is not specified. Jennifer C. from Traffic said a HAWK signal was proposed. This is also called a Pedestrian Hybrid Beacon (PHB).
I have two questions:
Who will be responsible for design, Jersey City or Homestead Assemblage LLC?
Who is paying for the design and installation?
jerseyflea (Utilizador Registado)
This study gives a good explanation of the HAWK / PHB traffic signal:
https://njbikeped.org/emerging-countermeasures-for-pedestrian-safety-2022/
See page 4.
This is the model for a successful HAWK / PHB installation:
https://cdnsm5-hosted.civiclive.com/UserFiles/Servers/Server_15209001/File/Departments/Transportation/Sign%20Standards/Updates/SS-108B.pdf
Two poles with signals and signs will be needed, one on each side of Pavonia.
Notice that there is a streetlight on the pole to illuminate the crosswalk. There should be TWO streetlights, one on each signal pole, on each side of Pavonia.
There is currently NO streetlight at this intersection.
Pole #69392 at 618 Pavonia Ave. used to have a streetlight that illuminated the mid-block pedestrian crossing. It was evidently removed as part of the construction in the area and/or PSE&G work.
This is a view from November 2020, before construction began:
https://www.google.com/maps/@40.7327851,-74.060958,3a,75y,333.18h,100.76t/data=!3m7!1e1!3m5!1smvRKccZO1HW9YudWwhYIrA!2e0!5s20201101T000000!7i16384!8i8192?entry=ttu
jerseyflea (Utilizador Registado)
jerseyflea (Utilizador Registado)
This is what it looks like at night.
I reported the missing streetlight to PSE&G.
Job / Order #3731703
Engineering - Althea (Oficial Verificado)
Engineering - Althea (Oficial Verificado)
I have passed on all of the information above, to the engineers and planners.
I also noted that the south side of Pavonia, near Homestaed Pl, probably didn't have a street light on the south side of Pavonia, due to the parking lot being well illuminated.
https://www.google.com/maps/@40.7328217,-74.0610898,3a,68.2y,151.57h,90.64t/data=!3m7!1e1!3m5!1sO8LOHmbqVgl_oVih6In-_Q!2e0!5s20130801T000000!7i13312!8i6656?entry=ttu