Thank you for contacting us about your concern. The section of I-215 between 4700 South and SR-201 is rough. We have worked to keep the roadway in as good of shape as possible over the years, however the pavement in this area has reached the end of its life. We are currently designing a project to rebuild the pavement in this area and expect to begin pavement reconstruction in the spring of 2016. In the meantime, we will continue to refill potholes as they appear. If there are specific areas that we have missed please let us know, the temperature and winter moisture cause the patches to fail sooner than those we install under better conditions.
5 评论s
Becky - UDOT Communications (官方验证)
Becky - UDOT Communications (官方验证)
已确认 UDOT Region 2 (官方验证)
UDOT Region 2 (官方验证)
关闭 Ashlee - UDOT Region 2 Operations (官方验证)