Description
This section of Bradlee Rd. was repaved a while back, probably over a year ago. The other side across 138 was completed but this stretch never seemed to get the final layer of asphalt or raised sewer/water infrastructure.
This section of Bradlee Rd. was repaved a while back, probably over a year ago. The other side across 138 was completed but this stretch never seemed to get the final layer of asphalt or raised sewer/water infrastructure.
1 Comment
Closed a (Guest)