Thank you for bringing this issue to our attention. City staff investigated and resolved the problem. Should you have any questions or concerns about the work performed, please leave a comment.
The City of Ann Arbor Field Operations Unit has visited the site and performed necessary pothole repairs. The overall condition of the pavement is such that it will be included on our list to evaluate for potential future street resurfacing.
03082016 2120hr inspected no potholes found, rough distorted road due to soil moisture with numerous previous patches. Recommendation made for repaving/reconstruction.
Thank you for bringing this issue to our attention. City staff investigated and resolved the problem. Should you have any questions or concerns about the work performed, please leave a comment.
8 Comments
Acknowledged City of Ann Arbor (Verified Official)
City of Ann Arbor (Verified Official)
Closed City of Ann Arbor (Verified Official)
Reopened mrniceguy (Registered User)
mrniceguy (Registered User)
Acknowledged City of Ann Arbor (Verified Official)
City of Ann Arbor (Verified Official)
The City of Ann Arbor Field Operations Unit has visited the site and performed necessary pothole repairs. The overall condition of the pavement is such that it will be included on our list to evaluate for potential future street resurfacing.
03082016 2120hr inspected no potholes found, rough distorted road due to soil moisture with numerous previous patches. Recommendation made for repaving/reconstruction.
Closed City of Ann Arbor (Verified Official)