Descripción
The DPW removed the dislodged cement from the Eastern Ave driveway apron of Century Bank and filled it in w asphalt. Need to be replace with concrete when weather allows. (JS)
The DPW removed the dislodged cement from the Eastern Ave driveway apron of Century Bank and filled it in w asphalt. Need to be replace with concrete when weather allows. (JS)
3 Comentars
City of Malden (Oficial verificado)
Reconocido Department of Public Works (Oficial verificado)
Cerrado Christopher Rosa (Superintendent of Cemeteries/Tree Warden) (Oficial verificado)
DPW repaired the sidewalk. Thank you for your request.
Christopher Rosa
Operations Manager
781-397-7160