Description
The DPW removed the dislodged cement from the Eastern Ave driveway apron of Century Bank and filled it in w asphalt. Need to be replace with concrete when weather allows. (JS)
The DPW removed the dislodged cement from the Eastern Ave driveway apron of Century Bank and filled it in w asphalt. Need to be replace with concrete when weather allows. (JS)
3 Commentaires
City of Malden (Membre officiel vérifié)
Reconnu Department of Public Works (Membre officiel vérifié)
Clos Christopher Rosa (Superintendent of Cemeteries/Tree Warden) (Membre officiel vérifié)
DPW repaired the sidewalk. Thank you for your request.
Christopher Rosa
Operations Manager
781-397-7160