9/28/10-Update: Several days after starting the slow, arduous task of replacing a small bridge, road crews patched a number of the major potholes in the road and worked on the leveling of the drainage ditch. Improvement, but shoulders are still in poor condition and need grading and crushed stone. Sure hope this road is on someones to-do list for resurfacing.
8/26/10 Update: Bridge replacement has started 8/16/10. Hope they plan on doing something with the road also, but I have my doubts.
This short road, about 1 mile, is a nightmare of potholes, deep, rough shoulders and a drainage intake at the 90 degree bend that is at least 6" below the road surface. Hempfield Twp. needs to take immediate action on this narrow, dangerous road.