This definitely has not been fixed. There have been sidewalk repairs on M Street around the 6th Street intersection. But for whatever reason the actual 6th Street section that still needs significant repair was excluded. The bricks are missing or uneven for much of the block between L and M. Please fix ASAP, or provide a status on when the city plans to address the problem.
This issue is definitely still open. Some sidewalk repair was recently made to the 6th and M intersection. But the rest of the block (6th between L and M) was excluded. The sidewalk bricks are missing or uneven in many, many places. Please fix ASAP or provide a status on when the repairs are scheduled in the future.
This is still an issue - AFTER 901 DAYS. I've reported it again and again. The eastern sidewalk of the 1100 block of 6th Street NW remains hazardous. Multiple bricks are missing up and down the block. It's unwieldy for the disabled and dangerous for people walking on two feet. When will the sidewalk be graded and re-bricked?
The bricks have been filled in but the sidewalk still remains uneven. Will report a separate request to regrade the overall sidewalk as it is still a hazard, especially to those using a wheelchair or walker.
7 Comments
An anonymous SeeClickFix user (Registered User)
An anonymous SeeClickFix user (Registered User)
An anonymous SeeClickFix user (Registered User)
An anonymous SeeClickFix user (Registered User)
An anonymous SeeClickFix user (Registered User)
An anonymous SeeClickFix user (Registered User)
Stängt An anonymous SeeClickFix user (Registered User)