الوصف
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
8 تعليقs
SCormier (تم التحقق رسميا)
تم إقراره SCormier (تم التحقق رسميا)
Display Name Blocked (1384260) (مستخدم مسجل)
IT Department (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
SCormier (تم التحقق رسميا)
Display Name Blocked (409268) (مستخدم مسجل)
مغلق DPW Engineering LW (تم التحقق رسميا)
Significant patching completed in 2019 to address concerns listed.
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.