Opis
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
8 Skomentujs
SCormier (Verified Official)
Potwierdzone SCormier (Verified Official)
Display Name Blocked (1384260) (Zarejestrowany użytkownik)
IT Department (Verified Official)
SCormier (Verified Official)
SCormier (Verified Official)
Display Name Blocked (409268) (Zarejestrowany użytkownik)
Zamknięte DPW Engineering LW (Verified Official)
Significant patching completed in 2019 to address concerns listed.
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.