A notice of violation was issued, not a stop work order. By ordinance, a contractor must be given two opportunities to correct a violation. He has 5 days from the issuance of the notice. These lots are under a different type of land disturbance permit than the lots in the back and these permits are considered as "tertiary". He was told to add silt fence at the back of the lots, to install inlet protection in the street and to clean up the mud tracked onto the streets. We will conduct follow up inspection.