Description
The ongoing delayed operations to complete the new sewage pumping station are running loud electric generators and disturbing the peace in the surrounding neighborhood. It seems that the system could be powered by silent BGE power that is readily available. Why not? The result has long since become intolerable and something needs to be done to reduce the noise pollution being emitted by this operation.
I'm a member of the Cape St. John Civic Association and I request an answer to my question above and an explanation of how this will be addressed. I'm at 443-254-4712 all the time.
a aussi demandé...
A. No
A. No
7 Commentaires
Anne Arundel County Admin (Membre officiel vérifié)
Clos Sue Raupuk (Membre officiel vérifié)
Sue Raupuk (Membre officiel vérifié)
Réouvert ThosEM (Utilisateur inscrit)
Admin 3 - KBD (Membre officiel vérifié)
Sue Raupuk (Membre officiel vérifié)
Clos BOH SD (Membre officiel vérifié)