Plumbing problems / Sewage back-ups Inilagay sa Artsibo

298 Cape Saint John Road Annapolis, MD Ipakita sa Mapa Itago ang Mapa
Move the marker to represent your issue's location. The address will not change.

Taong nagreport

ID ng Isyu:

3398830

Submitted To:

Housing/Health Issues

Kategorya:

Plumbing problems / Sewage back-ups

Tiningnan:

1083 beses

Lugar:

Parole

Inireport sa pamamagitan ng:

http://www.aacounty.org

Inireport:

noong

Ginawan ng duplikado ni:

3400102

Deskripsyon

The ongoing delayed operations to complete the new sewage pumping station are running loud electric generators and disturbing the peace in the surrounding neighborhood. It seems that the system could be powered by silent BGE power that is readily available. Why not? The result has long since become intolerable and something needs to be done to reduce the noise pollution being emitted by this operation.

I'm a member of the Cape St. John Civic Association and I request an answer to my question above and an explanation of how this will be addressed. I'm at 443-254-4712 all the time.

ay nagtanong din...
T. Is this an apartment, rooming house, or hotel?
S. No
T. Is sewage overflowing at the grinder pump, Mayo tank or house connection?
S. No

7 Komentos

  • Anne Arundel County Admin (Beripikadong Opisiyal)

  • Isinara Sue Raupuk (Beripikadong Opisiyal)

  • Sue Raupuk (Beripikadong Opisiyal)

  • Reopened ThosEM (Rehistradong User)

  • Admin 3 - KBD (Beripikadong Opisiyal)

  • Sue Raupuk (Beripikadong Opisiyal)

  • Isinara BOH SD (Beripikadong Opisiyal)

Sarado ang komento para sa mga isyu na nasa artsibo.