Plumbing problems / Sewage back-ups Đã lưu trữ

298 Cape Saint John Road Annapolis, MD Hiển thị trên Bản đồ Ẩn Bản đồ
Move the marker to represent your issue's location. The address will not change.
OK

Người báo cáo

ID Vấn đề:

3398830

Submitted To:

Housing/Health Issues

Danh mục:

Plumbing problems / Sewage back-ups

Đã xem:

1088 lần

Vùng lân cận:

Parole

Được báo cáo thông qua:

http://www.aacounty.org

Đã báo cáo:

vào

Được sao lại bởi:

3400102

Mô tả

The ongoing delayed operations to complete the new sewage pumping station are running loud electric generators and disturbing the peace in the surrounding neighborhood. It seems that the system could be powered by silent BGE power that is readily available. Why not? The result has long since become intolerable and something needs to be done to reduce the noise pollution being emitted by this operation.

I'm a member of the Cape St. John Civic Association and I request an answer to my question above and an explanation of how this will be addressed. I'm at 443-254-4712 all the time.

cũng đã hỏi...
Hỏi. Is this an apartment, rooming house, or hotel?
Đáp. No
Hỏi. Is sewage overflowing at the grinder pump, Mayo tank or house connection?
Đáp. No

7 Bình luậns

  • Anne Arundel County Admin (Chính thức đã xác nhận)

  • Đã đóng Sue Raupuk (Chính thức đã xác nhận)

  • Sue Raupuk (Chính thức đã xác nhận)

  • Reopened ThosEM (Người dùng đã đăng ký)

  • Admin 3 - KBD (Chính thức đã xác nhận)

  • Sue Raupuk (Chính thức đã xác nhận)

  • Đã đóng BOH SD (Chính thức đã xác nhận)

Tính năng bình luận bị đóng lại đối với vấn đề đã lưu trữ.