Description
Calloway project, Commerce side. Why would a catch basin for storm water run-off be placed next to a sanitary sewer manhole with a hole broken into the side?
Calloway project, Commerce side. Why would a catch basin for storm water run-off be placed next to a sanitary sewer manhole with a hole broken into the side?
3 Comments
Decatur Public Works - J Maximuk (Registered User)
Decatur Public Works - A Hedgebeth (Verified Official)
Closed Decatur Public Works - A Hedgebeth (Verified Official)
The construction of the new storm pipe to the storm manhole was completed.